PROJECT INFORMATION
CASE STUDY
1. Labour, plant, supervision, mobilisation / demobilisation.
2. All welfare, security and site establishment to be by main contractor.
3. Setting out to be the responsibility of the Main Contractor.
4. All earthworks will be carried out using 08 dozers with Scraper Boxes attached. There will be laser control for final grading I levels.
5. Work to be valued on a re-measured basis in accordance with CESMM3.6.We have not allowed for dealing with any contaminated materials.
7.lt is assumed that the excavation of 450m3 of concrete can be carried out using a 08.
AJ Morris Limited
Unit 5b, Sewstern Ind. Est.
Gunby Road Sewstern,
Grantham,
Lincolnshire, NG33 5RD
Telephone: 01476 862000
Fax: 01476 862001
Email: Contact us
Company. No: 06183578