The Project was for the creation of a New Training Facility for Reading FC.
AJM's works included: -
Removal of Topsoil and Sub-soil under Archaeological Supervision.
Carry out the cut/fill to the required areas utilising GPS machine control for optimum accuracy.
Trimming and preparation of Pitch Areas for 3G and stitched surfacing
Resoiling to the natural pitches and surrounding areas to a specification required by the landscape contractor.
On-going variations during the works meant constant surveying and quantity calculations were carried out by AJ Morris to ensure the most efficient use of available materials.