PROJECT INFORMATION

  • Client : MJ Abbott  
  • Type : Runway Project  
  • Value : £100,000
  • Completion Date : February 2017  

CASE STUDY

A J Morris were commissioned to carry out Earthworks of a 150,000 m² site at Goodwood Race Circuit.

Key tasks were to carry out site clearance & preparation so Earthworks could commence for the drain and runway.

Tasks included;

Clear site of vegetation and turf

Removal of topsoil

Bulk excavation

Seeding

A J Morris worked closely with Goodwood Race Circuit & Aerodrome ensuring that all reusable materials were stacked and stored in line with the engineers specifications and with Goodwood's guidance due to height restrictions enforced by the race circuit.